Labels

Tuesday, 8 November 2016

Day one in the TV studio

We spent one of our lessons in the tv studio, we had a recap of the tv studio going through the equipment. After we had a recap on what the equipment were we split in to teams and made a short multi cam production. One team was in charge of the control room, that's where the visual mixing took place. And another team was in the studio where they had to set up a quick show and rearranged the room. After we ran the test footage the teams swapped roles, so my team was now putting a quick show together while the other team was in the control room with the visual mixing.

Tom gave us an induction in to the control room as he showed us what we would be doing. Everybody had a roll in the control room, divided by 6 people, I was talking to the camera men making sure they knew what to do. I was the director.

No comments:

Post a Comment